PSU NEWS
NHPC to modify dam design on Subansiri river, add safety measures: Tarun Gogoi
Guwahati: Assam Chief Minister Tarun Gogoi on Thursday said that a Centre-appointed expert panel has suggested additional safety measures in the construction of the stalled Subansiri Lower Hydroelectric Project by National Hydroelectric Power Corporation (NHPC). -
The Central Government’s decision was conveyed in a letter by the Union Minister of State for Power Jyotiraditya Scindia earlier this week, Gogoi told reporters in Guwahati.
"As per the recommendation of Thatte Committee, an independent Dam Design Review Panel (DDRP) was formed. It has proposed some additional safety measures in the construction of the dam. Now, NHPC has been asked to modify the design of the dam," the Chief Minister said. The DDRP examined issues like foundation competency, seismic aspect, dam design and existing ground conditions, Gogoi said.
He said that the Power Ministry had accepted the recommendations and asked NHPC to proceed accordingly. Jagran Post.
News Must Read
- Shri. Bikram Ghosh takes charge as Director (Finance) in WCL
- SBI to change debit cards maintenance normal from 1 April, 2024
- NMDC excels at Governance Now 10th PSU Awards
- NTPC Group ties up JPY 30 billion funding from JBIC
- Jabalpur Airport connects Madhya Pradesh to other cities
- Best Organisations for Women title to PowerGrid
- Air India Faces Heavy Fine from DGCA of Rs 80 Lakh
- NCL's mega achievement; surpasses 500 Million Cubic Meters of Overburden
- RailTel bags major order from CDAC worth Rs 36 crore
- ICRA withdraws long term rating of NCDs of ONGC