JSW Energy Signs its First Hybrid PPA with GUVNL
The PPA is signed for the supply of power for a period of 25 years with a tariff of Rs 3.27/kWh.
JSW Energy Signs its First Hybrid PPA with GUVNL
New Delhi: JSW Renew Energy Seventeen Limited, a step-down subsidiary of JSW Energy Limited, has signed a Power Purchase Agreement (“PPA”) with GUVNL for STU-connected 192 MW Wind-Solar Hybrid capacity.
This marks the Company’s first PPA for a wind-solar hybrid capacity. The PPA is signed for the supply of power for a period of 25 years with a tariff of Rs 3.27/kWh.
The project is expected to be commissioned within 24 months and will be connected to the STU in Gujarat. The company currently has a project pipeline capacity of 8.3 GW with PPA signed for 3.2 GW. JSW Energy has a total locked-in generation capacity of 18.2 GW comprising of 7.7 GW operational, 2.1 GW under construction across wind, thermal, and hydro, and an RE pipeline of 8.3 GW.
Read Also : NTPC Ltd inaugurates world’s first CO-to-Methanol PlantThe company also has 16.2 GWh of locked-in energy storage capacity through a battery energy storage system and hydro-pumped storage project. The Company aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030. JSW Energy has set an ambitious target of achieving Carbon Neutrality by 2050.
Read Also : Gujarat to be first state to implement a dedicated semiconductor policyNews Must Read
- HPCL shares decline, see performance and future plans
- BEL Director (R&D) Job Vacancy: Check Last Date to apply, Pay Scale
- Bharat Electronics Ltd shares may revive, secures order worth Rs 500 crore
- BSE Chairman Pramod Agrawal resigns
- PFC Registered highest ever quarterly Profit in Q2 FY25, declared dividend
- ONGC stepped up as Principal Partner for IEW 2025 at ADIPEC2024
- Cochin Shipyard Q2: Shares dropped 5% to hit the lower circuit
- Two Independent Directors Step Down from Balmer lawrie
- NHPC Q2 results, shares fell by 5%, reported 37% decline in consolidated net profit
- Oil India secures critical mineral block in Arunachal Pradesh