JSW Energy Commissions 114 MW RE Capacity in September; Installed Capacity Stands at 13.2 GW
With this the cumulative organic RE capacity addition during Q2 FY26 stands at 443 MW, which includes 20 MW of Floating Solar capacity at Vijayanagar.

JSW Energy Commissions 114 MW RE Capacity in September; Installed Capacity Stands at 13.2 GW
Mumbai, India — October 4, 2025 – JSW Energy Limited pleased to announce that it has successfully commissioned 114 MW of renewable energy capacity during the month of September 2025, with solar capacity of 21 MW and wind capacity of 93 MW, taking the installed capacity to 13,211 MW.
With this the cumulative organic RE capacity addition during Q2 FY26 stands at 443 MW, which includes 20 MW of Floating Solar capacity at Vijayanagar. The share of renewables in the overall capacity stands at 57% constituting of wind capacity at 3,709 MW, solar capacity at 2,213 MW
and hydro capacity at 1,631 MW.
Join PSU Connect on WhatsApp now for quick updates! Whatsapp Channel
Read Also : PESB recommends Vishwanath Suresh as next CMD of MOILJSW Energy has total locked-in generation capacity of 30.5 GW comprising of 13.2 GW operational, 12.5 GW under-construction across thermal and renewable, 150 MW underacquisition hydro and has pipeline of 4.6 GW.
The company also has 29.4 GWh of locked-in energy storage capacity through hydro pumped storage projects of 26.4 GWh and battery energy storage system of 3.0 GWh. The Company aims to reach 30 GW generation capacity and 40 GWh of energy storage capacity by FY 2030 and achieve Carbon Neutrality by 2050.
Read Also : MOIL Registers Best ever September Production