JSW arm commenced commercial production at HSM steel plant, Vijaynagar
The HSM facility was lit up on March 17, 2024, and after the successful completion of trial runs and quality & delivery testing, commercial manufacturing and sales commenced.
The company has commenced Commercial Production at the Hot Strip Mill of JSW Vijayanagar Metallics Limited, a Wholly-Owned Subsidiary of the Company.
According to the company’s exchange filing the JSW Vijayanagar Metallics Ltd, (‘JVML’) a Wholly-Owned Subsidiary of the Company, has successfully commissioned its Hot Strip Mill (‘HSM’) at its integrated steel plant at Vijayanagar with a capacity of 5MTPA and has made its first dispatch.
Read Also : SJVN Limited holds 36th Annual General Meeting
The HSM facility has the capability of manufacturing plates, and coils and is equipped with advanced features such as Digital Reheating Furnaces, Evaporative Cooling System and Waste Heat Recovery System, Attached Edger in Finishing mills for accurate width control, Auto Steering Control, uniform mechanical properties and production of superior value-added grades.
The HSM facility was lit up on March 17, 2024, and after the successful completion of trial runs and quality & delivery testing, commercial manufacturing and sales commenced.
Read Also : BEL signs Agreement with Reliasat Inc. Canada to make a foray into space domain
News Must Read
- India’s Largest Bank, SBI raised Rs. 7,500 cr
- Indian Bank raises Rs. 5,000 Crores through issuance of Bonds
- NLCIL plans three fold increase in its total power generation capacity by 2030
- DVC enters into financial collaboration with State Bank of India
- IREDA Signs MoU with SJVN and GMR for 900 MW Hydropower Project in Nepal
- IREDA Signs MoU with SJVN and GMR fo Hydro Project in Nepal
- SJVN CMD visited 1320 MW Buxar Thermal Power Project
- Petroleum Minister Hardeep S Puri Highlights India’s Bioenergy Progress
- NBCC bags orders worth Rs. 182.50 Crore
- OMCs increases price of 19 kg commercial LPG cylinder by Rs 39