NTPC dispatched its first Coal Rake from NTPC Talaipalli Coal Mines

The commencement of rake loading paves the way forward for Talaipalli Mine to dispatch coal in a smooth and eco-friendly manner to meet the coal requirements of 1600 MW NTPC Lara.

NTPC dispatched its first Coal Rake from NTPC Talaipalli Coal Mines

Mumbai: India’s largest integrated energy company, NTPC Ltd. dispatched its first Coal Rake from NTPC Talaipalli Coal Mines to NTPC Lara Super Thermal Power Project in Chhattisgarh.

The MGR Track Length from Talaipalli to Lara is 65 km. The commencement of rake loading paves the way forward for Talaipalli Mine to dispatch coal in a smooth and eco-friendly manner to meet the coal requirements of 1600 MW NTPC Lara.

Shri Gurdeep Singh, CMD and Shri Chandan Kumar Mondol, Director (Commercial) NTPC along with RED (Coal Mining) & RED (WR II & OS) flagged off the first Coal Rake dispatch from NTPC Talaipalli to NTPC Lara Super Thermal Power Project.

This is a historical moment for NTPC.

Read Also : Indigenous Technology Cruise Missile successfully flight-tested by DRDO