JSW Neo Energy receives Letter of Award for 230 MW FDRE Capacity from SECI

JSW Energy has a total locked-in generation capacity of 16.4 GW comprising 7.5 GW operational, 2.3 GW under construction across wind, thermal, and hydro, and an RE pipeline of 6.6 GW (PPAs signed for 2.0 GW).

JSW Neo Energy receives Letter of Award for 230 MW FDRE Capacity from SECI

JSW Neo Energy Limited, a fully owned subsidiary of JSW Energy Limited, has received a Letter of Award (LoA) from the Solar Energy Corporation of India for the supply of 230 MW of Inter-State Transmission System (ISTS) connected firm and dispatchable renewable energy (FDRE).

 The capacity is awarded against the tariff-based competitive bid invited for the supply of 630 MW firm and dispatchable power from ISTS-connected renewable energy projects (SECI-FDRE-IV). Following this capacity award, the Company’s total locked-in generation capacity has risen to 16.4 GW, which includes a total locked-in Hybrid capacity of 2.3 GW (including FDRE).

Read Also : NLCIL signs MoU with IIM Calcutta

The Company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW currently. This project enhances the company’s energy solution offerings and supports its transition towards becoming an energy products and services company.

JSW Energy has a total locked-in generation capacity of 16.4 GW comprising 7.5 GW operational, 2.3 GW under construction across wind, thermal, and hydro, and an RE pipeline of 6.6 GW (PPAs signed for 2.0 GW).

The company also has 4.2 GWh of locked-in energy storage capacity through battery energy storage systems and hydro-pumped storage projects. The Company aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030. JSW Energy has set an ambitious target of achieving Carbon Neutrality by 2050.

Read Also : IREDA to Raise Approx Rs 4500 Cr Through Fresh Equity Issue