NTPC delivers stellar performance in Coal Production and Despatch in FY ‘24
The company achieved an impressive coal dispatch of 34.15 MMT till 31st March ,2024 in FY24, with an increase of 55.50 % YoY Growth. Further it achieved capex utilization of 1640 Crores which is 104.8 % of the target of 1565 Crores.
![NTPC delivers stellar performance in Coal Production and Despatch in FY ‘24](https://www.psuconnect.in/sdsdsd/NTPC_delivers_stellar_performance_in_Coal_Production_and_Despatch_in_FY_24.jpg)
NTPC Ltd., India's leading integrated power utility has recorded a stellar performance from its five operational captive coal mines with record coal production of 34.39 MMT till 31st March in FY24, surpassing the actual target of 34 MMT set by Govt. of India with a significant YoY growth of 48.21 %.
The company achieved an impressive coal dispatch of 34.15 MMT till 31st March ,2024 in FY24, with an increase of 55.50 % YoY Growth. Further it achieved capex utilization of 1640 Crores which is 104.8 % of the target of 1565 Crores.
In addition, NTPC Coal mining achieved Highest ever single day coal production & dispatch of 1.8 LMT (on 30.03.2024) and 1.29 LMT (on 28.03.2024) respectively. Coal production has commenced from Kerendari Coal mining Project ,NTPC ‘s 5 th Captive Mine. All coal mines of NTPC have achieved and exceeded their targets and geared up to set new benchmarks in the future.
Read Also : IndusInd Bank Q1 FY25 results, net profit at 2% YoYDulanga CMP has achieved 5 Star rating from the Ministry of Coal, and it has stood amongst the top 3 mines of the country for the last three years .NTPC Mining Limited (NML) has received a credit rating of AAA from CRISIL & CARE.
NTPC Mining Limited (NML), a wholly owned subsidiary of NTPC Limited has received a vesting order of all 6 coal mines from the Ministry of Coal and it has won the bid for North Dadu (East) coal block in the coal block auction conducted by the Ministry of Coal.
Till date, NTPC has produced about 103 + million metric tonnes (MMT) of coal from its five operational captive coal mines i.e Pakri Barwadih &,Chatt-Bariatu & Kerendari Coal Mines in Jharkhand, Dulanga Coal Mine in Odisha and Talaipalli Coal Mine in Chhattisgarh.
Read Also : RBI issues guidelines on higher liquidity coverage ratio for retail depositsNML is fueling 13% of NTPC Thermal Generation thereby contributing towards Energy Atmanirbhata and envisions reaching the capacity of 100 million Tonnes per Annum.
NML remains committed to delivering reliable and sustainable power to the nation. This remarkable growth in coal production and despatch is a testament to NTPC's dedication to operational excellence and its contribution to meeting India's energy demands. The company will continue to implement innovative technologies and safety practices to further enhance its performance and support the nation's energy goals.
Read Also : India assumes the Chair of Asian Disaster Preparedness CentreNews Must Read
- Karnataka Bank Announced record Q1 Net Profit at Rs. 400.33 CR
- NTPC, BHEL shares soar higher amid JV announcement in Budget 2024
- BEL signs tripartite MoU for manufacture of indigenised ammunition
- Goa Shipyard Limited launched first indigenous P1135.6 Frigate
- Chandan Sinha appointed as Non-Executive Part Time Chairman of RBL Bank
- OIL and Dolphin Drilling signs contract for hiring of Blackford Dolphin
- Cmde D.K. Murali, IN (Retd.) Joins as CMD of BECIL
- Samir Chandra Saxena Appointed as Director (Market Operation) of GRID-INDIA
- MOIL CMD bags Title 'CEO of the Year'
- ONGC sign MoU with GSI to advance geothermal exploration in Ladakh