PSU NEWS
THDC commences draft tube installation for Vishnugad Pipalkoti HEP in Uttarakhand
The 444 MW hydroelectric project is located on the Alaknanda River, near Helong village in Uttarakhand.
THDC India Limited has commenced the installation of the draft tube in Unit 1 of the Vishnugad Pipalkoti Hydroelectric project (HEP).
The draft tube is crucial for channeling water that has passed through the turbine blades back into the river while maintaining pressure and enabling energy recovery.
This installation is essential for optimizing the overall performance and efficiency of the power generation process.
The 444 MW hydroelectric project is located on the Alaknanda River, near Helong village in Uttarakhand.
Read Also : LIC launches single-premium micro-term insurance for financial groupsNews Must Read
- RBI approves Partha Pratim Sengupta as MD and CEO of Bandhan Bank
- Hindustan Aeronautics gets status of 14th 'Maharatna' PSU
- EIL and GAIL achieve major milestone
- Mahanadi CoalfieldsĀ Places 289 Youths in Industry
- Power Grid Corporation secures Major Rajasthan Transmission System Project
- Mazagon Dock bags Rs 121.7-crore order in Maharashtra for AI-based projects
- Indian Navy signs MoU with Bajaj Alliance Life Insurance for providing insurance products
- Indian Railways to install Kavach 4.0 system in 10,000 Locomotives
- IREDA Board approves new unit for retail businesses like PM Kusum
- UPPCL Secures Approval for 500 MW Solar Power Procurement