THDC commences draft tube installation for Vishnugad Pipalkoti HEP in Uttarakhand

The 444 MW hydroelectric project is located on the Alaknanda River, near Helong village in Uttarakhand.

THDC commences draft tube installation for Vishnugad Pipalkoti HEP in Uttarakhand

THDC India Limited has commenced the installation of the draft tube in Unit 1 of the Vishnugad Pipalkoti Hydroelectric project (HEP).

The draft tube is crucial for channeling water that has passed through the turbine blades back into the river while maintaining pressure and enabling energy recovery.

This installation is essential for optimizing the overall performance and efficiency of the power generation process.

The 444 MW hydroelectric project is located on the Alaknanda River, near Helong village in Uttarakhand.

Join PSU Connect on WhatsApp now for quick updates! Click here

Read Also : No more fear of missing out (FOMO) - this AI cloud miner made $40,530 in 42 days with $50,000!

Disclaimer: All the articles and given information on this page are information based and provided by other sources . For more read Terms & Conditions