APTEL Sets Aside APERC Order on CUF Limits in Favor of JSW Energy Subsidiaries

APTEL set aside the APERC order limiting tariffs beyond normative CUF, ruling in favor of JSW Energy subsidiaries and directing AP Discoms to pay applicable generic tariffs with interest.
APTEL Sets Aside APERC Order on CUF Limits in Favor of JSW Energy Subsidiaries

Mumbai: JSW Energy Limited has announced a major legal victory before the Appellate Tribunal for Electricity (APTEL) regarding a long-standing tariff dispute concerning wind energy generation beyond prescribed Capacity Utilization Factor (CUF) limits in Andhra Pradesh.

In a regulatory disclosure submitted to the stock exchanges on November 18, 2026, under Regulation 30 of the SEBI Listing Regulations, the company reported that APTEL issued a favorable ruling on November 17, 2026.

Background of the Dispute

The litigation originated from an order issued by the Andhra Pradesh Electricity Regulatory Commission (APERC) on October 18, 2023. The APERC order had directed Andhra Pradesh DISCOMs to pay a penal or reduced rate of ₹0.50 per unit for energy supplied by wind power generators beyond the normative Capacity Utilization Factor (CUF).

Challenging this restriction, four JSW Energy subsidiaries—JSW Vayu (Tungabhadra) Private Limited, JSW Vayu (Indravati) Private Limited, JSW Wind Power (Pennar) Private Limited, and JSW Wind Power Limited—filed formal appeals before APTEL, contesting the initial disclosure made on September 30, 2023

Follow PSU Connect:WhatsApp

Key Highlights of the APTEL Order

  • APERC Order Set Aside: APTEL formally allowed the appeals filed by JSW subsidiaries and completely set aside the earlier APERC ruling.

  • Full Tariff Payment Mandated: The Tribunal directed AP Discoms to pay for all energy generated by the wind power plants at the applicable generic tariff, irrespective of whether the actual generation exceeded the normative CUF.

  • Interest Included: Payments must be disbursed along with applicable interest in strict accordance with the terms laid out in the respective Power Purchase Agreements (PPAs).

Filing Summary Table

Parameter

Details

Company Name

JSW Energy Limited (BSE: 533148 | NSE: JSWENERGY)

Regulatory Regulation

Regulation 30(4) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015

Appellant Subsidiaries

JSW Vayu (Tungabhadra) Pvt Ltd, JSW Vayu (Indravati) Pvt Ltd, JSW Wind Power (Pennar) Pvt Ltd, JSW Wind Power Ltd

Opposing Authority

Andhra Pradesh Electricity Regulatory Commission (APERC) & AP Discoms

APTEL Order Date

November 17, 2026

Company Secretary

Monica Chopra