Advertisement

PFC Discloses Encumbrance on 56.38% Vedanta Power Shares

Power Finance Corporation has received non-disposal undertakings over 56.38% of Vedanta Power's equity tied to rupee term loans for two thermal power projects.
PFC Discloses Encumbrance on 56.38% Vedanta Power Shares

New Delhi, November 27, 2026: Power Finance Corporation Limited (PFC) has disclosed that undertakings covering 56.38% of Vedanta Power Limited's (VPL) equity shares have been executed in its favour. The shares have not been transferred to PFC. The disclosure was filed with NSE and BSE under Regulation 29 of the SEBI Takeover Regulations.

What PFC Disclosed

The undertakings are tied to rupee term loans that PFC is providing to VPL for two coal-based thermal power projects. They follow a modified sanction letter dated 29 April 2026. All four undertakings are dated 25 November 2026.

Undertaking

Given by

Project

Minimum stake to be held

Non-disposal

Twin Star Holdings and Vedanta Holdings Mauritius II

Project 1: 2x600 MW (1,200 MW) sub-critical plant, Chhattisgarh

50.1% of VPL equity

Non-disposal

Twin Star Holdings and Vedanta Holdings Mauritius II

Project 2: 3x660 MW (1,980 MW) super-critical plant, Punjab

50.1% of VPL equity

Undertaking

Vedanta Resources Limited

Project 1

51% (direct or indirect)

Undertaking

Vedanta Resources Limited

Project 2

51% (direct or indirect)

Each commitment applies for as long as the respective term loan remains in force.

Advertisement
Follow PSU Connect:WhatsApp

Key Numbers

  • Shares covered: 2,20,47,24,753 equity shares

  • Share of VPL's capital: 56.38%

  • Total VPL equity shares: 3,91,03,88,057, unchanged before and after

What This Means

PFC's holding before and after the arrangement is nil. It is not buying shares or taking voting rights. The filing treats the undertakings as an "encumbrance" because the promoter-side entities have agreed not to sell below the stated stakes. PFC is not part of the promoter group.

The filing does not state the loan amount or the interest rate.

Advertisement
Follow PSU Connect:LinkedIn

Note*: This article is for informational purposes only. PSU Connect is not responsible for any actions taken based on this content.Terms & Conditions