PSU NEWS
NTPC Group installed capacity crosses 76GW solar power mark
The PSU giant has begins operation of 57-MW Rajasthan solar project.
![NTPC Group installed capacity crosses 76GW solar power mark](https://www.psuconnect.in/sdsdsd/sjvn53.jpg)
According to exchange filing made by the company, State-owned power giant NTPC Group's installed power generation capacity has crossed the 76 GW-mark with commissioning of a 57-MW solar power energy capacity in Rajasthan.
As per the filing, Consequent upon successful commissioning and due approvals, first part capacity of 57 MW out of 90 MW Anta Solar PV Project at Anta, Rajasthan, is declared on commercial operation with effect from 00:00 hours of April 26, 2024.
Read Also : IndusInd Bank Q1 FY25 results, net profit at 2% YoYWith this, it stated, the total installed and commercial capacity of NTPC on a standalone and group basis has reached 59,135 MW and 76,015 MW, respectively.
Read Also : RBI issues guidelines on higher liquidity coverage ratio for retail depositsNews Must Read
- Karnataka Bank Announced record Q1 Net Profit at Rs. 400.33 CR
- NTPC, BHEL shares soar higher amid JV announcement in Budget 2024
- BEL signs tripartite MoU for manufacture of indigenised ammunition
- Goa Shipyard Limited launched first indigenous P1135.6 Frigate
- Chandan Sinha appointed as Non-Executive Part Time Chairman of RBL Bank
- OIL and Dolphin Drilling signs contract for hiring of Blackford Dolphin
- Cmde D.K. Murali, IN (Retd.) Joins as CMD of BECIL
- Samir Chandra Saxena Appointed as Director (Market Operation) of GRID-INDIA
- MOIL CMD bags Title 'CEO of the Year'
- ONGC sign MoU with GSI to advance geothermal exploration in Ladakh