PM Narendra Modi to Inaugurate First Mile Connectivity Projects of SECL in Chhattisgarh Tomorrow
These projects, valued at over Rs 600 crore, mark a significant step towards faster, eco-friendly, and efficient mechanized coal evacuation.
![PM Narendra Modi to Inaugurate First Mile Connectivity Projects of SECL in Chhattisgarh Tomorrow](https://www.psuconnect.in/sdsdsd/PM_Narendra_Modi_to_Inaugurate_First_Mile_Connectivity_Projects_of_SECL_in_Chhattisgarh_Tomorrow2.jpg)
New Delhi: In line with India’s commitment to strengthening energy security and furthering sustainable development, Prime Minister Shri Narendra Modi is scheduled to virtually inaugurate three key First Mile Connectivity Projects of South Eastern Coalfields Limited (SECL), a Coal India Subsidiary under the Ministry of Coal, in Chhattisgarh tomorrow. These projects, valued at over Rs 600 crore, mark a significant step towards faster, eco-friendly, and efficient mechanized coal evacuation.
The Dipka OCP Coal Handling Plant, located in SECL's Dipka Area, stands out as a key project constructed at a cost exceeding Rs. 211 Crore.
With an annual coal handling capacity of 25 MT, the project features an overground bunker capacity of 20,000 tons and a 2.1 km long conveyor belt, facilitating the rapid loading of 4,500 – 8,500 tons of coal per hour. Moreover, the project will ensure eco-friendly transportation by minimizing road-based coal movement between the pit and rail sidings, thereby curbing carbon emissions.
Read Also : IndusInd Bank Q1 FY25 results, net profit at 2% YoYThis will not only benefit the environment but also enhances operational efficiency by significantly reducing rake loading time to less than an hour.
Another noteworthy project is the Chhal OCP Coal Handling Plant in SECL’s Raigarh Area, built at a cost of over 173 crores. With a capacity to handle 6 MT of coal annually, it includes an overground bunker, a conveyor belt spanning 1.7 km, and a Silo with a capacity of 3,000 tons.
Read Also : RBI issues guidelines on higher liquidity coverage ratio for retail depositsAdditionally, the Baroud OCP Coal Handling Plant at SECL Raigarh Area, designed to handle 10 MT of coal annually, has been completed at a cost of Rs. 216 crores. Equipped with an overground bunker capacity of 20,000 tons and a 1.7 km conveyor belt, the project features a rapid loading system capable of loading 5000-7500 tons of coal per hour, significantly streamlining the loading process and contributing to operational efficiency.
Aligning with the PM GatiShakti National Master Plan, these projects demonstrate commitment to provide multi-modal connectivity and enhancing coal infrastructure across the region. By generating local employment opportunities and ensuring efficient energy supply, they play a pivotal role in the socio-economic development of the area.
Embracing the principles of environmental sustainability, the First Mile Connectivity (FMC) projects minimize reliance on coal transportation via roads, thus reducing traffic congestion, road accidents, and environmental impact.
Read Also : India assumes the Chair of Asian Disaster Preparedness CentreNews Must Read
- Karnataka Bank Announced record Q1 Net Profit at Rs. 400.33 CR
- NTPC, BHEL shares soar higher amid JV announcement in Budget 2024
- BEL signs tripartite MoU for manufacture of indigenised ammunition
- Goa Shipyard Limited launched first indigenous P1135.6 Frigate
- Chandan Sinha appointed as Non-Executive Part Time Chairman of RBL Bank
- OIL and Dolphin Drilling signs contract for hiring of Blackford Dolphin
- Cmde D.K. Murali, IN (Retd.) Joins as CMD of BECIL
- Samir Chandra Saxena Appointed as Director (Market Operation) of GRID-INDIA
- MOIL CMD bags Title 'CEO of the Year'
- ONGC sign MoU with GSI to advance geothermal exploration in Ladakh