RVNL emerges Lowest bidder from MMRC, Nagpur metro
The Period of the project is 30 Months and the project cost is Rs 187 crore.
![RVNL emerges Lowest bidder from MMRC, Nagpur metro](https://www.psuconnect.in/sdsdsd/rvnl17.jpg)
Rail Vikas Nigam Limited emerges as the Lowest Bidder (L1) from Maharashtra Metro Rail Corporation Limited (Nagpur Metro).
Railway PSU Rail Vikas Nigam Limited has emerged as the Lowest Bidder (L1) from Maharashtra Metro Rail Corporation Limited (Nagpur Metro) for the “Construction of 6 Nos Elevated Metro Stations (Cantonment, Kamptee Police Station, Kamptee Municipal Council, Dragon Palace, Golf Club, and Kanhan River Metro Station) between Ch. – 7576.78mm to Ch - 13457.76m in Reach 2B of NMRP Phase 2.”
Read Also : IndusInd Bank Q1 FY25 results, net profit at 2% YoYThe entity awarding the contract is Maharashtra Metro Rail Corporation Limited, Nagpur for the Construction of 6 Nos Elevated Metro Stations (Cantonment, Kamptee Police Station, Kamptee Municipal Council, Dragon Palace, Golf Club, and Kanhan River Metro Station) between Ch. - 7576.78m m to Ch - 13457.76m in Reach 2B ofNMRP Phase 2.
The Period of the project is 30 Months and the project cost is Rs 187 crore.
Read Also : RBI issues guidelines on higher liquidity coverage ratio for retail depositsNews Must Read
- Karnataka Bank Announced record Q1 Net Profit at Rs. 400.33 CR
- NTPC, BHEL shares soar higher amid JV announcement in Budget 2024
- BEL signs tripartite MoU for manufacture of indigenised ammunition
- Goa Shipyard Limited launched first indigenous P1135.6 Frigate
- Chandan Sinha appointed as Non-Executive Part Time Chairman of RBL Bank
- OIL and Dolphin Drilling signs contract for hiring of Blackford Dolphin
- Cmde D.K. Murali, IN (Retd.) Joins as CMD of BECIL
- Samir Chandra Saxena Appointed as Director (Market Operation) of GRID-INDIA
- MOIL CMD bags Title 'CEO of the Year'
- ONGC sign MoU with GSI to advance geothermal exploration in Ladakh