CE-MAT 2025

BHEL bags an order from NTPC to build Super Thermal Power Project

Bharat Heavy Electricals Limited has received an order from NTPC Ltd for setting up the Singrauli Super Thermal Power Project, Stage-III (2x800MW) in Sonebhadra District, Uttar Pradesh.

BHEL bags an order from NTPC to build Super Thermal Power Project

New Delhi: BHEL has bagged an order for an EPC package of Singrauli Super Thermal Power Project Stage-III (2*800 MW), District Sonbhadra, Uttar Pradesh on March 5. The nature of the order is to supply the equipment- Boiler, Turbine, Generator, and associated auxiliaries along with electrical and C&I, Balance of Plant Package, etc.

In addition to this Erection & Commissioning and Civil works are also provided. The same was provided through International Competitive Bidding.

Join PSU Connect on WhatsApp now for quick updates! Whatsapp Channel CE-MAT 2025

Read Also : Anita Barik appointed as Group General Manager (C&O) of CONCOR

The Completion of the project or Completion of Facilities ( COF) for Unit 1 will be accomplished in 50 months and for Unit 2 in 54 months. The cost of the project is more than Rs 9500 crore excluding GST.

Read Also : HUDCO sign MoU with Nagpur Metropolitan Region Development Authority to provide funds

Note*: All the articles and given information on this page are information based and provided by other sources . For more read Terms & Conditions