
New Delhi: Surat, the financial capital of Gujarat and hub for diamond and textile business in India attracts air travellers in large numbers. Considering the magnificent rise in passenger traffic, AAI is extensively working towards the holistic development of the airport with a project cost of Rs. 353 Crore.
The development project includes an extension of the existing terminal building from 8474 sqm to 25520 sqm. In addition to the extension of the terminal building, the expansion of the apron from five parking bays to 18 Parking bays and the construction of a parallel taxi track (2905 m X23 m) work is also in progress.
Read Also : NLCIL Employees Wins 3rd prize in state level 'Enviro-Solver Hackathon'After completion of the project, the new state-of-the-art extended terminal building will be capable of serving 1200 Domestic and 600 International passengers during peak hours making an annual passenger capacity of 3.5 Million. Equipped with all modern passenger amenities, the terminal building will have 19 check-in counters, five aerobridges, an in-Line baggage handling system, and five conveyor belts for arriving passengers. The new terminal building will also have a parking area with a capacity for 475 cars.
Read Also : Prerana Ladies Club organised CSR initiativeNew Terminal Building will be adorned with local art, depicting Gujarat’s vibrant kite festival and textile craftsmanship. The terminal will be a 4-Star GRIHA-rated energy-efficient building with sustainability features. The interiors of the terminal building will reflect the art and culture of Gujarat. More than 90% of the work for the extension of the terminal building is completed and the building is expected to be ready by July 2023.
Surat Airport facilitates to a large number of business communities across the country. The new world-class terminal building of the airport will enhance the connectivity to this industrial City, giving impetus to the overall growth of the region
Read Also : Lok Sabha speaker Om Birla gives away Lion’s Roar to Restore SDG awardsNews Must Read
- AI's Revolution: People disagree on how AI can change work life
- PM Modi to inaugurate first-ever National Training Conclave
- SECI and GRIDCO Odisha signed an agreement
- CIL Chairman Pramod Agarwal reviews WCL
- NHDC to construct 525 MW Pumped Storage Power Project to meet peak hour energy demand of MP
- Speeding up Hydro Power: CEA Fast-tracks Approval Mechanism for Pumped Storage Projects
- WhatsApp unveiled new feature called 'Channels'
- RBI not looking to withdraw 500 notes or re-introducing Rs 1,000 currency: Governor
- DRDO flight-tested ‘Agni Prime’ ballistic missile
- J&K Jaiswal Bridge over Chenab has been completed: Nitin Gadkari